backup
This commit is contained in:
parent
be9c341773
commit
7ec4acea07
|
@ -0,0 +1,40 @@
|
|||
[Location] EGG-1: Stationary above Joon.UR8Xt
|
||||
[User] Mary Scentis
|
||||
[Subject] Preparations for P386
|
||||
|
||||
| Project ID: P386
|
||||
| Location: DEC Station Holographic Modeling Group, Llayana.TI
|
||||
| Description: Assist on deployment of a ludicrous remote borescope
|
||||
|
||||
The whole team is going out for a month or so along with two other groups to
|
||||
get the new scope in place at DEC and decommision the old one. Luckily one of
|
||||
the other teams is freighting the scope-- we just show up with our tools.
|
||||
|
||||
Llayana's geological situation is unique in our sector. Plant life evolves at
|
||||
an accelerated pace, and people on the surface have been playing with these
|
||||
mutations for generations. They've developed their own systems for analyzing
|
||||
topology, with a huge borescope orbiting the planet, analyzing links between
|
||||
multiple ecologies simultaneously and running holographic models at the atomic
|
||||
level from the DEC. Something you can't do on the surface. The DEC orbital
|
||||
station is where most of the science happens, and where we'll be doing our
|
||||
work. The original scope has served them well but their new scope is exiting
|
||||
developmental stages and ready for production.
|
||||
|
||||
Dave is going to handle components of the calibration with the other teams.
|
||||
Lae's software will undergo testing and then she'll be training the operators
|
||||
at the station. Floid and I are project managing some of the smaller teams.
|
||||
|
||||
The new scope is some serious shit. Lae's been locked away working on the
|
||||
interface and feeding us little bits of information. Did you know they'll be
|
||||
able to not only model plant mutations anywhere on Llayana in realtime, but
|
||||
alter DNA from orbit? It's all home brewed tech, too.
|
||||
|
||||
Everyone's set to depart in about 40 hours. We get a big chunk of the old
|
||||
scope as payment so carrying it back on the return trip will take a few days.
|
||||
The droid is coming with us, it's got Floid convinced it'll somehow be of
|
||||
use. Everyone will be operating on their strengths. When it's over, we should
|
||||
be able to take another break but I've booked 2 sequential jobs so it'll
|
||||
have to be a short one.
|
||||
|
||||
We'll be landing on Llayana and loading up on supplies midway through the
|
||||
project. Elsewise we'll be in orbit the entire trip.
|
|
@ -1,3 +1,4 @@
|
|||
0EGG-1 - Preparations for P386 /EGG-1/EGG-1_Log-2.txt
|
||||
0EGG-1 - EGG-1 QEC Lives /EGG-1/EGG-1_Log-1.txt
|
||||
0Melchizedek - Emergency Recording from Shuttle 004 /Melchizedek/020.txt
|
||||
0Stines Legacy - Did Someone Misplace A Planet? /Stines Legacy/stine_0002.txt
|
||||
|
|
|
@ -2,6 +2,55 @@
|
|||
<title>Cosmic Voyage</title>
|
||||
<link>gopher://cosmic.voyage</link>
|
||||
<description>Messages from the human stellar diaspora</description>
|
||||
<item>
|
||||
<title>EGG-1 - Preparations for P386</title>
|
||||
<author>ffog@cosmic.voyage (ffog)</author>
|
||||
<link>gopher://cosmic.voyage/0/EGG-1/EGG-1_Log-2.txt</link>
|
||||
<guid>gopher://cosmic.voyage/0/EGG-1/EGG-1_Log-2.txt</guid>
|
||||
<pubDate>Sun, 22 Sep 2019 18:05:44 GMT</pubDate>
|
||||
<description><![CDATA[<pre>
|
||||
[Location] EGG-1: Stationary above Joon.UR8Xt
|
||||
[User] Mary Scentis
|
||||
[Subject] Preparations for P386
|
||||
|
||||
| Project ID: P386
|
||||
| Location: DEC Station Holographic Modeling Group, Llayana.TI
|
||||
| Description: Assist on deployment of a ludicrous remote borescope
|
||||
|
||||
The whole team is going out for a month or so along with two other groups to
|
||||
get the new scope in place at DEC and decommision the old one. Luckily one of
|
||||
the other teams is freighting the scope-- we just show up with our tools.
|
||||
|
||||
Llayana's geological situation is unique in our sector. Plant life evolves at
|
||||
an accelerated pace, and people on the surface have been playing with these
|
||||
mutations for generations. They've developed their own systems for analyzing
|
||||
topology, with a huge borescope orbiting the planet, analyzing links between
|
||||
multiple ecologies simultaneously and running holographic models at the atomic
|
||||
level from the DEC. Something you can't do on the surface. The DEC orbital
|
||||
station is where most of the science happens, and where we'll be doing our
|
||||
work. The original scope has served them well but their new scope is exiting
|
||||
developmental stages and ready for production.
|
||||
|
||||
Dave is going to handle components of the calibration with the other teams.
|
||||
Lae's software will undergo testing and then she'll be training the operators
|
||||
at the station. Floid and I are project managing some of the smaller teams.
|
||||
|
||||
The new scope is some serious shit. Lae's been locked away working on the
|
||||
interface and feeding us little bits of information. Did you know they'll be
|
||||
able to not only model plant mutations anywhere on Llayana in realtime, but
|
||||
alter DNA from orbit? It's all home brewed tech, too.
|
||||
|
||||
Everyone's set to depart in about 40 hours. We get a big chunk of the old
|
||||
scope as payment so carrying it back on the return trip will take a few days.
|
||||
The droid is coming with us, it's got Floid convinced it'll somehow be of
|
||||
use. Everyone will be operating on their strengths. When it's over, we should
|
||||
be able to take another break but I've booked 2 sequential jobs so it'll
|
||||
have to be a short one.
|
||||
|
||||
We'll be landing on Llayana and loading up on supplies midway through the
|
||||
project. Elsewise we'll be in orbit the entire trip.
|
||||
</pre>]]></description>
|
||||
</item>
|
||||
<item>
|
||||
<title>EGG-1 - EGG-1 QEC Lives</title>
|
||||
<author>ffog@cosmic.voyage (ffog)</author>
|
||||
|
|
Loading…
Reference in New Issue