30 lines
737 B
Plaintext
30 lines
737 B
Plaintext
*** SYSTEM INITIALIZING ***
|
|
BOOTING MAIN OS... [E-OS v2.12.5]
|
|
MAIN OS CHECK... [GOOD]
|
|
THE DATE IS: JAN 1, 1970
|
|
THE TIME IS: 00:00
|
|
RUN> AUTOCHK
|
|
*** AUTOCHECK STARTING ***
|
|
[...]
|
|
[...]
|
|
[...]
|
|
[...]
|
|
[...]
|
|
*** AUTOCHECK COMPLETE ***
|
|
--- RESULTS ---
|
|
POWER: REACTOR FUNCTIONAL
|
|
CRYOBAY: 11 NON-FUNCTIONAL, 1 FUNCTIONAL
|
|
MAIN ENGINES: OPERATING AT 66.5% CAPACITY
|
|
NAVIGATION: NON-FUNCTIONAL
|
|
THERMAL CONTROLS: OPERATING AT 70% CAPACITY
|
|
COMPUTER SYSTEMS: FAULT IN SECTION A3, OTHERWISE FUNCTIONAL
|
|
LIFE SUPPORT: OPERATING AT 96% CAPACITY
|
|
HULL: NO BREACHES, INTEGRITY AT 98%
|
|
COMMUNICATIONS: FULLY FUNCTIONAL, RELAY DETECTED
|
|
*** ATTEMPTING CONNECTION TO QEC RELAY ***
|
|
[...]
|
|
[...]
|
|
[...]
|
|
*** CONNECTION SUCCESSFUL ***
|
|
*** BEGIN WAKE-UP FOR G. SIMMONS ***
|